Residential building
S 9000
acrylcolor DB 703
Wolfsburg / Deutschland
2016
KSP Jürgen Engel Architekten / Braunschweig
NEULAND Wohnungsgesellschaft mbh / Wolfsburg
MABO Fenster und Türen GmbH & Co. KG / Oschersleben
En 2012, le Fraunhofer-Institut für Windenergie und Energiesystemtechnik à Bremerhaven a ouvert un immeuble d'ingénieurs pour tester les pales de rotor. Les bureaux des étages supérieurs sont agencés dans un plan de sol en forme de vantail et offrent une vue saisissante sur la mer du Nord.
Where a small baroque house torn down in 1959 once stood, there is now a 6 storey building complex with 20 apartments in total in Bamberg city centre. Whilst renovating the building which is close to the centre with good transport connections, the designing architect was able to create a modern design complying to sound insulation class 4 despite a construction style from the 1950s and it being a protected building. Concurrently, it was all about tying in the modified facade in terms of the colour concept which was developed especially for the building, with the structure which was already there. Crucially, the modern French casement windows made from the GEALAN-System S 9000 helped the architect fulfil his aim. With their size and colour coordination, they fit harmoniously into the image of Markusstrasse as a whole.
Les bâtiments sont un ensemble d'immeubles à appartements de 1910-1911 sur la Lutterothstrasse 95-97.
Je souhaite recevoir l'actualité GEALAN par e-mail (environ 2 fois par mois) gratuitement. Désinscription possible à tout moment.